Gravel road construction

grovel stone near me

Construction Process

  1. Prepare for construction.
  2. Measure the area.
  3. Start earthwork.
  4. Clean up the roadbed.
  5. Compact the roadbed.
  6. Lay the gravel road surface.
  7. Inspect and accept the backfill compaction.

Earthwork

  • Based on the depth of the excavation, prepare the appropriate excavator.
  • A dump truck will assist in loading and transporting the soil.
  • Within 20 meters of the foundation, excavation and leveling will be aided by manual labor.

Roadbed Compaction

  • Use a tire-type vibrating roller to roll 4-8 times, with the exact number of passes depending on the actual requirements.
  • Small tamping machines will be used to compact areas where large machinery cannot reach, such as corners of the structure and nearby areas.

Pad Construction

  • Select pad materials according to design requirements.
  • Ensure the laying thickness meets design specifications.
  • Perform rolling as required by the design.